Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the check-email domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/vcfsa.com/httpdocs/wp-includes/functions.php on line 6114
» News

News

RWE adjudica a Técnicas Reunidas y Ansaldo Energia el proyecto de una central de ciclo combinado de hidrógeno en Alemania

Técnicas Reunidas y Sinopec consiguen dos contratos en Arabia Saudí por más de 3.300 millones de dólares

TR signs a framework service agreement with Saudi Aramco for its oil and gas projects

Técnicas Reunidas begins engineering for an e-methanol production plant with green hydrogen in Almería

ACCIONA construirá y operará la desaladora de Los Cabos (México)

ACCIONA acelera la construcción de la desalinizadora Shuqaiq 3, en Arabia Saudí, hasta alcanzar la plena producción

SASA POLYESTER adjudica a Técnicas Reunidas un importante
proyecto petroquímico en Turquía

ACCIONA construirá su quinta desaladora en Arabia Saudí por 294 millones de dólares

TR firma con Saudi Aramco un acuerdo marco de servicios para sus proyectos de petróleo y gas

Contact

Contact with us

Team

Meet the team

We are people

VCF has a team of top-level professionals,
trained to provide great value to our customers

Our Team